| Paper | Title | Page | 
    
        | TU4P20 | Simulated Commissioning for Diamond-II Storage Ring from On-axis to Off-axis Injection | 124 | 
    
        |  | 
                H.-C. Chao, I.P.S. MartinDLS, Oxfordshire, United Kingdom
 |  | 
    
        |  | The Diamond-II storage ring commissioning simulations have continued based on the previous results where on-axis injected beams are captured. The next goal is to enlarge the dynamic aperture so that off-axis injection can be achieved. The procedures include beam based alignment, beta-beating correction and linear optics correction. Details of the implementations are discussed and the simulation results are presented. In the end, we are able to reach off-axis injection which allows accumulation. |  | 
    
    	  | DOI • | reference for this paper 
              ※ doi:10.18429/JACoW-FLS2023-TU4P20 |  | 
    
    	  | About • | Received ※ 22 August 2023 — Revised ※ 30 August 2023 — Accepted ※ 31 August 2023 — Issued ※ 02 December 2023 | 
    
    	  | Cite • | reference for this paper using 
              ※ BibTeX, 
              ※ LaTeX, 
              ※ Text/Word, 
              ※ RIS, 
              ※ EndNote (xml) |  | 
    
        |  |